417-501-0077
Dock slips are only available with unit purchase. They are not included in the unit price and do not correspond with the unit number purchased (e.g., Purchasing Big Bear Unit 1 does not mean slip #1 is included). Slip choice is on a first-come, first-served basis.
Secure your watercraft in one of the 18 premium slips. All slips feature durable concrete decks and splinter-free poly-wood to ensure long-lasting quality without the headache of rotting wood. Enjoy peace of mind with built-in rash rails and a protective roof to shield your boat from the elements. In addition, the spacious swim deck with walkout stairs, a ladder, and our convenient fish-cleaning station are all included.
1
Available
2
Available
3
Available
4
Available
5
Available
6
SOLD
7
Available
8
SOLD
9
Available
10
SOLD
11
SOLD
12
UNDER CONTRACT
13
UNDER CONTRACT
14
SOLD
15
UNDER CONTRACT
16
SOLD
17
Available
18
SOLD
Add Your Tooltip Text Here
1
Available
2
Available
3
Available
4
Under Contract
5
Available
6
SOLD
7
Available
8
SOLD
9
SOLD
10
SOLD
11
SOLD
12
SOLD
13
SOLD
14
SOLD
15
SOLD
16
SOLD
17
Available
18
SOLD
Total Slips: 18
Slip Size: 11′ x 28′
Deck Material: Splinter-free poly-wood
Power Source: Passive solar as regulated by the Army Corp. of Engineers*
Ammenities: Large swim dock with steps and ladder, porch swing, picnic tables, fish cleaning station
Dock Pricing Breakdown:
| Dock labor, clean dock, move in and out | $1,200 | |||
| Spider spraying | $1,200 | |||
| Insurance | $4,000 | |||
| Maintenance fund for solar system, etc | $3,600 | |||
| Permit with Core of Engineers | $200 | |||
| $10,200 | /18 | $567/year |
Total Slips: 18
Slip Size: 11′ x 28′
Deck Material: Splinter-free poly-wood
Power Source: Passive solar as regulated by the Army Corp. of Engineers*
Ammenities: Large swim dock with steps, porch swing, picnic tables, fish cleaning station.
Dock Pricing Breakdown YEARLY COST:
| Dock labor, clean dock, move in and out | $1,200 | |||
| Spider spraying | $1,200 | |||
| Insurance | $4,000 | |||
| Maintenance fund for solar system, etc | $3,600 | |||
| Permit with Core of Engineers | $200 | |||
| $10,200 | /18 | $567 |